Keyword: dipole
Paper Title Other Keywords Page
MOP12 Production of Cavity Beam Position Monitors for the ARES Accelerator at DESY resonance, cavity, simulation, experiment 47
 
  • D. Lipka, M. Holz, S. Vilcins
    DESY, Hamburg, Germany
 
  The SINBAD facility (Short and INnovative Bunches and Accelerators at DESY) hosts various experiments in the field of production of ultra-short electron bunches and novel high gradient acceleration techniques. The SINBAD facility, also called ARES (Accelerator Research Experiment at SINBAD), is a conventional S-band linear RF accelerator allowing the production of low charge ultra-short electron bunches within a range between 0.5 pC and 1000 pC. The positions of the low charge bunches will be detected by cavity beam position monitors. The principal design is based on the experience from the EU-XFEL cavity beam position monitors. It consists of a 316 LN stainless steel body with a design loaded quality factor of 70, a resonance frequency of 3.3 GHz and a relative wide gap of 15 mm to reach a high peak position sensitivity of 4.25 V/(nC mm). This poster covered, the manufacture of the individual mechanical parts, as well as presents the special features in the manufacture of customer designed UHV feedthroughs.  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-MOP12  
About • Received ※ 05 September 2022 — Revised ※ 09 September 2022 — Accepted ※ 11 September 2022 — Issue date ※ 06 November 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOP23 Recent LHC SR Interferometer Simulations and Experimental Results radiation, simulation, synchrotron, synchrotron-radiation 88
 
  • D. Butti, E. Bravin, G. Trad
    CERN, Meyrin, Switzerland
  • S.M. Gibson
    Royal Holloway, University of London, Surrey, United Kingdom
 
  At the CERN Large Hadron Collider (LHC), among the different systems exploiting Synchrotron Radiation (SR) for beam diagnostics, interferometry is under study as a non-invasive technique for measuring absolute beam transverse sizes. Extensive numerical simulations, recently completed for characterising the spatial coherence of the LHC SR source, facilitated the optimisation of the LHC interferometer design and the existing prototype system tested in the past has been refurbished to include the new simulation findings. This contribution describes the simulation specificity and then focuses on first measurements performed at the beginning of the LHC run 3. Such experiments allowed to obtain a first validation of the expected system performance at the injection energy of 450 GeV. A complete benchmark of the simulations will be carried out in 2022 as soon as the LHC will reach its top energy of 6.8 TeV.  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-MOP23  
About • Received ※ 06 September 2022 — Revised ※ 09 September 2022 — Accepted ※ 13 September 2022 — Issue date ※ 04 October 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP11 A Cryogenic RF Cavity BPM for the Superconducting Undulator at LCLS cavity, coupling, cryogenics, GUI 241
 
  • C.D. Nantista, A.A. Haase, P. Krejcik
    SLAC, Menlo Park, California, USA
 
  The new superconducting undulator beamline at LCLS requires the BPMs to be operated at cryogenic temperatures alongside the undulator magnets. They are used for beam-based alignment of the undulator magnets and quadrupole and require submicron resolution to achieve good FEL performance. This is to be achieved with X-band RF cavity BPMs, as is done now on the permanent undulator beamline. However, operating the cavities at cryogenic temperatures introduces significant challenges. We review the changes in RF properties of the cavities that result from cooling and how the design is changed to compensate for this. This includes a novel approach for employing a rectangular cavity with split modes to separately measure the X and Y position without coupling.  
poster icon Poster TUP11 [1.875 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-TUP11  
About • Received ※ 11 September 2022 — Revised ※ 12 September 2022 — Accepted ※ 13 September 2022 — Issue date ※ 11 November 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP31 The Cryogenic Current Comparator at CRYRING@ESR detector, cryogenics, diagnostics, storage-ring 300
 
  • L. Crescimbeni, D.M. Haider, A. Reiter, M. Schwickert, T. Sieber, T. Stöhlker
    GSI, Darmstadt, Germany
  • H. De Gersem, N. Marsic, W.F.O. Müller
    TEMF, TU Darmstadt, Darmstadt, Germany
  • M. Schmelz, R. Stolz, V. Zakosarenko
    IPHT, Jena, Germany
  • F. Schmidl
    FSU Jena, Jena, Germany
  • T. Stöhlker
    IOQ, Jena, Germany
  • T. Stöhlker, V. Tympel
    HIJ, Jena, Germany
  • V. Zakosarenko
    Supracon AG, Jena, Germany
 
  Funding: Work supported by the BMBF under contract No. 05P21SJRB1.
The Cryogenic Current Comparator (CCC) at the heavy-ion storage ring CRYRING@ESR at GSI provides a calibrated non-destructive measurement of beam current with a resolution of 10 nA or better. With traditional diagnostics in storage rings or transfer lines a non-interceptive absolute intensity measurement of weak ion beams (< 1 µA) is already challenging for bunched beams and virtually impossible for coasting beams. Therefore, at these currents the CCC is the only diagnostics instrumentation that gives reliable values for the beam intensity independently of the measured ion species and without the need for tedious calibration procedures. Herein, after a brief review of the diagnostic setup, an overview of the operation of the CCC with different stored ion beams at CRYRING is presented. The current reading of the CCC is compared to the intensity signal of various standard instrumentations including a Parametric Current Transformer (PCT), an Ionization Profile Monitor (IPM) and the Beam Position Monitors (BPMs). It was shown that the CCC is a reliable instrument to monitor changes of the beam current in the range of nA.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-TUP31  
About • Received ※ 06 September 2022 — Revised ※ 09 September 2022 — Accepted ※ 11 September 2022 — Issue date ※ 19 November 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEP14 Cavity BPM Electronics for SINBAD at DESY cavity, electron, electronics, interface 413
 
  • B. Lorbeer, H.T. Duhme, I. Krouptchenkov, T. Lensch, D. Lipka, S. Vilcins, M. Werner
    DESY, Hamburg, Germany
 
  The SINBAD(Short and INnovative Bunches and Accelerators at DESY ) R&D accelerator is planned for studying new concepts for high gradient electron beam acceleration and the generation of ultra-short electron bunches. The accelerator called ARES(Accelerator Research Experiment At DESY) is composed of S-band accelerating structures. In order to achieve the goal of very short electron bunches the electron beam charges generated in the RF Gun can vary in a range from 1nC down to 500fC. In order to measure the beam position with good resolution at the small charge end of 500fC a new cavity BPM(beam position monitor) has been developed. One key component in the BPM system is the custom RF electronics to meet the resolution requirements in the entire charge range. The entire BPM system with a focus on the system design requirements and the utca based RF electronics are presented in this paper.  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-WEP14  
About • Received ※ 07 September 2022 — Revised ※ 10 September 2022 — Accepted ※ 12 September 2022 — Issue date ※ 12 December 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)